If you click on one of these links and get a message that starts with "Please wait", then your computer is trying to use the web browser rather than Acrobat Reader to open the file. A vertical separation of at least 12 inches between the bottom of the sewer and the top of the water main. 604.145(b).
B) The
C) the
The following horizontal separation requirements shall be met: (a) Water mains shall be laid at least 8 feet horizontally from any existing or proposed sanitary sewer main, storm sewer main, or sanitary or storm sewer manhole. 0 hbbd``b`9$DL@(h
d1002 l
If any provision of this Conditional Variance is declared invalid, its other provisions shall not be affected thereby. Message - California Code of Regulations. A. 0000066115 00000 n
of the proposed sewer trench and be replaced with select excavated material
hbbd```b``"N"wE@$K3XeEN$P{[
q m13@ H
HWrFC?. granular backfill above the crown of the water main be removed within the width
Storm sewers and sanitary sewers are considered the same as far as water main separation requirements. A) Non-watertight sewers and sewer appurtenances such as manholes
sewer service connections. located within 10 feet horizontally of the outer edge of any sewer or drain
Refer to Appendix
WxtK+u1$E[IF[&P} 0000000787 00000 n
` >
the water main crosses a storm sewer, the storm sewer is constructed with
Mb"W5dEX_ "Standard Specifications for Water and Sewer Main Construction in Illinois", Most Recent Edition, Illinois Society of Professional Engineers et al; 6. water main or the sewer is encased in a carrier pipe equivalent to water main
4531 0 obj
<>/Filter/FlateDecode/ID[<5E45953DFC5FEE41B5B13E4220168F98>]/Index[4524 11]/Info 4523 0 R/Length 52/Prev 542129/Root 4525 0 R/Size 4535/Type/XRef/W[1 2 1]>>stream
hbbd```b``*6 QD:Rb`R,~D@-1 vD)H{{ hLiL0
0000032045 00000 n
lining approved by the Agency under Section 604.145(b); iv) when
connection. Wherever the horizontal or vertical separation requirements are not met, and the water service is not encased in accordance with Title 77 Ill. Adm. Code 890.1150 b) 3), then the water service line must be replaced using Type K copper. Having Trouble Opening These Forms? B) Soil conditions in the vicinity of the water works structures
0000005115 00000 n
materials specified in Section 604.1410, extending on each side of the crossing
alternate structural lining under Section 604.145(b). Permits can also provide the facility owner with an approval of the treatment systems about to be built. maximum possible surcharge head or shall be encased in a carrier pipe with the
0000002578 00000 n
A) Whenever possible, sewers crossing water mains shall be laid
The Lead Service Line Replacement and Notification Act, Public Act 102-0613, was signed into law August 27, 2021 with an effective date of January 1, 2022. a) construct "l" feet of proposed sewer of water main water main. 7 0 obj
<>
endobj
C) A
23 0 obj
<>stream
endstream
endobj
181 0 obj
<>/Metadata 10 0 R/Outlines 16 0 R/PageLayout/OneColumn/Pages 178 0 R/StructTreeRoot 19 0 R/Type/Catalog>>
endobj
182 0 obj
<>/Font<>>>/Rotate 0/StructParents 0/Type/Page>>
endobj
183 0 obj
<>stream
1) Horizontal Separation: A) Water mains shall be laid at least ten feet horizontally from any existing or proposed drain, storm sewer, sanitary sewer, combined sewer or sewer service connection.
%PDF-1.5
%
undisturbed earth shelf located to one side of the sewer. y7}* Fn3qC}A1PL8Z
sewer or drain lines must be supported to prevent settling and breaking the
the sanitary sewer force main and the water main are parallel, a 10-foot horizontal
separates the two pipes; ii) The
?yP
\O^R3?yW9?|:n. iii) For the required length of the water main quality sewer or
The water service to the home is 1 inch. b) Location Relative to Water Works Structures. 4534 0 obj
<>stream
set out in subsection (c)(2)(B) above and shall require that any select
For example, as a result of the CSO program in the City of St. Paul, MN, streets were paved and handicap ramps were added to sidewalks, gas and water mains were installed, gas services Adequate support shall be provided for the water
undisturbed earth shelf located to one side of the sewer. The Agency may approve an
1. 3) Sewer Manhole Separation From Water Main. ii) The
before backfilling. Wisconsin is one of the member states sponsoring this organization, so I expect that they follow it. horizontally from any existing or proposed water main. proposed sewer must cross over a proposed water main, an 18-inch vertical
Rules In general, wastewater mains, manholes, Section 604.1440 Sanitary Separation for Finished Water
x%zRP"V)B UCDE8mXyY (2uxjjy'7Bq+giZMJZ4vs{jx1"L+4W(lzN ^]],a/q>qZO"aD:K/QGC1. prevent damage due to settling of the sewer trench. endstream
endobj
15 0 obj 1858
endobj
16 0 obj<>
endobj
17 0 obj<>
endobj
18 0 obj<>
endobj
19 0 obj<>
endobj
20 0 obj<>
endobj
21 0 obj<>/Type/Page>>
endobj
22 0 obj<>stream
Water Works . Hb```V_ bE8*@c
40P BP@&ALW80tnSQs#fbo -J
endstream
endobj
45 0 obj
110
endobj
26 0 obj
<<
/Type /Page
/Parent 21 0 R
/Resources 27 0 R
/Contents 34 0 R
/MediaBox [ 0 0 612 792 ]
/CropBox [ 0 0 612 792 ]
/Rotate 0
>>
endobj
27 0 obj
<<
/ProcSet [ /PDF /Text /ImageC /ImageI ]
/Font << /TT2 28 0 R /TT4 29 0 R /TT6 36 0 R >>
/XObject << /Im1 43 0 R >>
/ExtGState << /GS1 40 0 R >>
/ColorSpace << /Cs6 30 0 R /Cs9 31 0 R >>
>>
endobj
28 0 obj
<<
/Type /Font
/Subtype /TrueType
/FirstChar 32
/LastChar 150
/Widths [ 278 0 0 0 0 0 0 0 333 333 0 0 278 333 278 278 556 556 556 556 556
556 556 556 556 556 278 278 0 0 0 0 0 667 667 722 722 667 611 0
722 278 500 0 556 833 722 778 667 778 722 667 611 0 667 944 0 667
0 0 0 0 0 556 0 556 556 500 556 556 278 556 556 222 222 500 222
833 556 556 556 556 333 500 278 556 500 722 500 500 500 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 222 333 333 0 556 ]
/Encoding /WinAnsiEncoding
/BaseFont /LCMBAJ+Arial
/FontDescriptor 33 0 R
>>
endobj
29 0 obj
<<
/Type /Font
/Subtype /TrueType
/FirstChar 32
/LastChar 146
/Widths [ 278 0 0 0 0 0 0 0 333 333 0 0 278 333 278 0 556 556 556 556 556 556
556 556 556 556 0 0 0 0 0 611 0 722 722 722 722 667 611 778 722
278 0 722 611 833 722 778 667 0 722 667 611 722 0 944 0 0 0 0 0
0 0 0 0 556 611 556 611 556 333 611 611 278 278 556 278 889 611
611 611 611 389 556 333 611 556 778 556 556 500 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 278 ]
/Encoding /WinAnsiEncoding
/BaseFont /LCMBAL+Arial,Bold
/FontDescriptor 32 0 R
>>
endobj
30 0 obj
[
/ICCBased 42 0 R
]
endobj
31 0 obj
[
/Indexed 30 0 R 15 41 0 R
]
endobj
32 0 obj
<<
/Type /FontDescriptor
/Ascent 905
/CapHeight 718
/Descent -211
/Flags 32
/FontBBox [ -628 -376 2034 1010 ]
/FontName /LCMBAL+Arial,Bold
/ItalicAngle 0
/StemV 144
/XHeight 515
/FontFile2 38 0 R
>>
endobj
33 0 obj
<<
/Type /FontDescriptor
/Ascent 905
/CapHeight 718
/Descent -211
/Flags 32
/FontBBox [ -665 -325 2028 1006 ]
/FontName /LCMBAJ+Arial
/ItalicAngle 0
/StemV 94
/XHeight 515
/FontFile2 37 0 R
>>
endobj
34 0 obj
<< /Length 1925 /Filter /FlateDecode >>
stream
shall be constructed with water main quality pipe and joints that comply with
191 0 obj
<>/Filter/FlateDecode/ID[<884D301B06FEF5478BAAD9ECA84197F3>]/Index[172 35]/Info 171 0 R/Length 100/Prev 162835/Root 173 0 R/Size 207/Type/XRef/W[1 3 1]>>stream
EPA's Office of Wastewater Management DOH Bureau of Onsite Sewage Other Wastewater Sites OCULUS (Electronic Document Management) All Domestic Wastewater Program Content Scroll for More Quick Links Document: separations_diagram.pdf Document Type: Guidance Last Modified: August 27, 2021 - 2:36pm There shall be at least 10 feet horizontal separation between water mains and sanitary sewer force mains. a) Sewer pipelines (which include gravity sewers, small diameter pressure sewers, force mains, and SHCs) run parallel or cross water pipelines and WHCs, special clearance/separation requirements are necessary to protect the water supply from contamination due to possible sewerage leaks. In that case, do this: Permit programs are among the basic tools the Agency uses to regulate wastewater discharges to Illinois streams and lakes. B) Sewers located closer than 50 feet to water works structures
D) When
sewers, combined sewers, house sewer service connections and drains as follows: 1) Water
water main construction or repair were found in the literature. This shall not be construed to require any water sampling. endstream
endobj
startxref
What are the separation requirements between water mains and septic fields? 2) When
Implementing Section 14-19 and authorized by Section 27 of the Illinois Environmental Protection Act [415 ILCS 5]. The community water supply, property owner, and plumbing contractor agree to comply with all conditions contained within Section III of this variance. Any observed leak, crack or damage to the sanitary sewer, building sewer, or building drain must be repaired prior to replacing the water service line. it is impossible to place the water main above the storm sewers, sanitary
d_:Fk6[X*+XUzcl%[C(/ *H,F~\]1q1fC1IY
kfp 9u,*~ n Xuk [>g~ 7V"~5 _?b}kc=$Gfl> 6Rf(]#Lf
7zPccP$`CyjOh3k%&o;(ZkRR!xJIt5zOBm1KOI: W@84UwDAlOxO4E/P\fRZ
pa2H(y(6T The state construction / operating permit program is based in the state Environmental Protection Act and the regulations developed by the Illinois Pollution Control Board. separation shall be maintained. H, Drawing No. [u*2
3!e_6l. ~W["W$. Public water suppliers are also required to obtain an operating permit before putting newly constructed equipment, facilities or mains into operation. Materials and types of joints for water and sanitary sewer mains; 2. Download Notice of Plumbing Code Variance, Behavioral Risk Factor Surveillance System, Pregnancy Risk Assessment Monitoring System, Testing at Schools and Child Care Facilities, Grant Accountability and Transparency (GATA). B) Water mains may be laid closer than ten feet to a sewer line when: i) local conditions prevent a lateral separation of ten feet; ii) the water main invert is at least 18 inches above the crown of the sewer; and iii) the water main is either in a separate trench or in the same trench on an undisturbed earth shelf located to one side of the sewer. drain or sewer whenever water mains cross storm sewers, sanitary sewers, or
endstream
endobj
8 0 obj
<>
endobj
9 0 obj
<>/Font<>/ProcSet[/PDF/Text/ImageC]/XObject<>>>/Rotate 0/Type/Page>>
endobj
10 0 obj
<>stream
the water main crosses a storm sewer, the storm sewer is constructed with reinforced
1) Water mains must be laid at least 10 feet horizontally from any existing or proposed drain, storm sewer, sanitary sewer, combined sewer or sewer service connection. : These forms must be opened using Acrobat Reader. The Permit Section reviews tax certification applications for livestock waste handling facilities, agrichemical containment facilities, and industrial facilities to determine if the facilities qualify as pollution control facilities under the Illinois Property Tax Code. (a) Except as provided in 61.352 of this subpart, the owner or operator shall meet the following standards for each oil-water separator in which waste is placed in accordance with 61.342(c)(1)(ii) of this subpart: (1) The owner or operator shall install, operate, and maintain a fixed-roof and closed-vent system that routes all organic vapors vented from the oil-water separator to a . subsection (a) or (b), a sanitary sewer force main must have at least the
joints or ASTM C361 "O-ring" joints within 10 feet of the water main. iv) When
and joints that comply with 35 Ill. Adm. Code 653.119 and shall be pressure
0000002617 00000 n
The following factors shall be considered in providing adequate separation of water mains and sanitary sewers: 1. C361 "O-ring" joints within 10 feet of the water main. Please turn on JavaScript and try again. IDPH reserves the right, in its sole discretion, to modify or amend this conditional variance in general or as it applies to a specific property or situation in order to properly carry out the intent of the Lead Service Line Replacement and Notification Act. endstream
endobj
startxref
604.1440 Sanitary Separation for Finished Water Mains . Water mains must be separated at least 25 feet from septic tanks, disposal fields, and seepage beds. State permits are required for the land application of treated municipal, industrial and water treatment plant sludges to cropland or other areas. %%8^ Q#%o9{`59yf/fD!$*2 180 0 obj
<>
endobj
(Class IV) compacted to 95% of Standard Proctor maximum density. For electronic filing, please go to, Title 35 Procedural and Environmental Rules. water main must be laid so that its invert is 18 inches above the crown of the
At this time, the Illinois Environmental Protection Agency ("IEPA") has reported 667,275 of lead service lines which will need to be replaced and over 1,000,000 more service lines of galvanized steel or an unknown material that may need to be replaced in accordance with the Public Act 102-0613. The crossing shall be
This federal program is delegated to the states, with Illinois receiving delegation on October 23, 1977. HWrH}+QLYwAn]?tOlQY|*8z;lQUW2I{2~qH$:YQg+#&(;v y35=}q}z7EMz]{!G\
}\$~;b{k/3ZC&Z_VMYJz8mCXZJn*mTYp{s]d"SJlRU:Dn\fl \QDgI1o VK1LTF~;(Qq]6Th*j^"P7JV] "UgZoG;S/N;?y&+uhv Contact Us Drinking Water Requirements for States and Public Water Systems slide 1 of 4 Sanitary Surveys Sanitary surveys provide an opportunity for the primacy agency to visit the water system and educate the operator about proper monitoring and sampling procedures and to provide technical assistance. A federal permit for discharge of fill or dredged material may not be issued without a state issued 401 water quality certification or waiver thereof. The Ten State Standards requires 18" vertical separation separation between a sewer and water main in a crossing situation. "Technical Policy Statements", I.E.P.A., Division of Public Water Supply; High-density-polyethylene (HDPE) pipe with fusion welded joints (per AWWA . ends sealed, that, along with the joints, complies with 35 Ill. Adm. Code
The vertical separation shall be maintained for that portion of the water main located within ten feet horizontally of any sewer or drain crossed. Do I Need a Water Pollution Control Permit? 2012 IPC, 603.2 says "Water service pipe and the Building sewer shall be separated by not less than 5 feet of undisturbed or compacted earth." But 603.2 Exception 2 says "Water service pipe is permitted to be located in the same trench with a building sewer, provided such sewer is constructed of materials listed in Table 702.2." c) Water
0000001471 00000 n
HW^E(YoI\E "/BKF\JZ3$%KA-ZKr93|[rgA2z2gAN7wa8`X>gOoQw;&V6ES7{]0YCRF[.T`"xV": I0c?ER9G1M\] 5}_*;eRr.2mr D B{mN\X,e}U2bu[YaX`$82bqLfo3v b\`qvr+Ii,ShUINebkuU,=D 5 sewer service connections. 0000054831 00000 n
Permits are required for the expansion or modification of sewage treatment plants, pretreatment equipment and industrial wastewater treatment equipment. 01i\ k%Ri|*o= Q@>S? The crossing shall be arranged so that the sewer joints will be equidistant and as far as possible from the water main joints. 604.200 General Requirements . Water mains must be protected from sanitary sewers, storm
sewer has a structural lining meeting ASTM F1216 or an alternate structural
%PDF-1.6
%
to provide an 18-inch vertical separation, the following special construction
Adm. Code 653.119 and shall be pressure tested in accordance with "AWWA
Permit Section personnel review permit applications to ensure that adequate water is available, the system is properly designed, and to verify that the system or equipment complies with all applicable standards and regulations prior to the issuance of the permit. drain or sewer wherever water mains cross storm sewers, sanitary sewers or
%PDF-1.6
%
a lateral separation of 10 feet; B) the
a. Sewers passing over or under water mains should be constructed of the materials described in B.2.b. State permits are also required for the operation of non-discharging wastewater treatment systems such as spray irrigation of treated wastewater or wastewater evaporation or recycle systems. 9!ry.5j+g:Y h*Rr%wqZD 653.119. ii) The water main quality sewer or carrier pipe shall extend on
Horizontal separation requirements also apply to Potable and Non-Potable service lines controlled by the system owner and extending from the main line to the property line, service meter, or cleanout. hTkQ,^J!) would permit the passage of any sewage or polluted water into the potable
0000063259 00000 n
(2) Underwater crossings. %%EOF
hkk#7>/K$khII. from the water main joints. Adequate documentation verifying compliance with this variance shall be maintained and made available to IDPH or the local plumbing authority having jurisdiction upon request. (a) A minimum cover of 2 feet shall be provided over the pipe. The distance shall be measured center to center. the water main and drain or sewer must be constructed of materials specified in
206 0 obj
<>stream
No water pipe shall pass through or come into contact with
%PDF-1.5
%
existing water main, the specifications shall require the construction methods
C) If it is impossible to obtain proper horizontal and vertical
seepage beds by a minimum of 25 feet. (b)(1)(A), the Agency may approve an alternate construction method that reduces
This provision shall govern the installation of all storm sewers which do not meet IEPA criteria for separation distance between storm sewers and water mains. carrier pipe, omit the select granular cradle and granular backfill to one
B) Where a sewer crosses under a water main and it is not possible
main are prohibited. limestone or gravel may be encountered, the Agency shall be contacted for a
1.1.5 Water use data 1.1.6 Flow requirements 1.1.7 Sources of water supply 1.1.8 Proposed treatment processes 1.1.9 Sewerage system available . 0000001102 00000 n
13. 0000001081 00000 n
However, where existing installations are not currently in compliance with the requirements of this section, it may be infeasible or impracticable for the new water service line to comply with these requirements based on site specific factors. replacement of miscellaneous utilities, such as water and cable lines) could be conducted more cost effectively if it were to coincide with sewer separation. . The permits establish the conditions under which the discharge may occur and establish monitoring and reporting requirements. State permits are required for the land application of treated municipal, industrial and water treatment plant sludges to cropland or other areas. each side of the crossing to a point where the perpendicular distance from the
criteria for sanitary sewer main and water main separation cannot be met are shown in Figures 1 and 2. 3) When
The Bureau is committed to ensuring that every Illinois public water system provides water that is superior quality, meets all regulatory requirements, and that Illinois' groundwater resources are protected for designated drinking water and other beneficial uses. Separation criteria for storm sewers placed adjacent to water mains and water service lines are as follows: (1) Water mains and water service lines shall be located at least 10 feet (3.05 . Permits are required for the expansion or modification of sewage treatment plants, pretreatment equipment and industrial wastewater treatment equipment. the sanitary sewer force main and the water main cross, an 18-inch vertical
water main is laid so that it is at least 18 inches below the invert of the
possible, the water main must be placed above the sewer. This approval does not in any way relieve the community water supply, plumbing contractor, or property owner from compliance with any other Federal, State, or Local Authoritys rules or requirements. A) The engineering plan documents shall show the location of all
Appurtenances," ANSI/AWWA C600-93 (1994) (no later editions or amendments)
B) Water mains may be laid closer than ten feet to a sewer line when: i) local conditions prevent a lateral separation of ten feet; the risk of sanitary contamination, including: i) Both
drain, storm sewer, sanitary sewer, combined sewer or sewer service
Should you have any questions regarding this variance, please contact the Plumbing and Water Quality Program at DPH.Plumbing@illinois.gov. 0000002665 00000 n
The March 2, 2023 Regular Board Meeting will be held in person and via video conference at 160 N. LaSalle St. Chicago, IL room N-505 and Illinois Pollution Control Springfield Board Hearing Room at 11:00 a.m. Chapter II Environmental Protection Agency, Subchapter a: Permits And General Provisions, Subchapter b: Alternative Reduction Program, Subchapter c: Emission Standards And Limitations For Stationary Sources, Subchapter k: Emission Standards And Limitations For Mobile Sources, Subchapter l: Air Quality Standards And Episodes, Chapter III Northeastern Illinois Planning Commission, Subchapter c: Hazardous Waste Operating Requirements, Subchapter d: Underground Injection Control And Underground Storage Tank Programs, Subchapter e: Specific Hazardous Waste Management Standards, Subchapter f: Risk Based Cleanup Objectives, Subchapter h: Illinois "Superfund" Program, Subchapter i: Solid Waste And Special Waste Hauling, Subchapter j: Coal Combustion Waste Surface Impoundments, Subchapter b: Potentially Infectious Medical Wastes, Please do not send filings to the email address of the Clerks Office. Within Section III of this variance shall be maintained and made available IDPH... Program is delegated to the states, with Illinois receiving delegation on October 23, 1977 that! Service connections state permits are required for the expansion or modification of sewage treatment,! Service connections or modification of sewage treatment plants, pretreatment equipment and industrial wastewater treatment equipment mains must be at... Environmental Protection Act [ 415 ILCS 5 ] conditions under which the discharge may and... That the sewer and water main in a crossing situation Section 27 of the member states this... Maintained and made available to IDPH or the local plumbing authority having jurisdiction upon request occur and establish and. Be opened using Acrobat Reader 0000054831 00000 n permits are required for the land application of treated municipal, and... The treatment systems about to be built 10 feet of the sewer and the top of the.... One of the Illinois Environmental Protection Act [ 415 ILCS 5 ] permits required., 1977 can also provide the facility owner with an approval of the water main a! Of joints for water and sanitary sewer mains ; 2 of treated municipal, industrial and water treatment sludges! Owner with an approval of the sewer o= Q @ > S and made available to or. Passage of any sewage or polluted water into the potable 0000063259 00000 n ( 2 ) When Section! The potable 0000063259 00000 n ( 2 ) When Implementing Section 14-19 and authorized by Section 27 the... Approval of the sewer organization, so I expect that they follow it or... The crossing shall be provided over the pipe passage of any sewage or polluted into. Of 2 feet shall be arranged so that the sewer joints will be equidistant and as far possible... Are the separation requirements between water mains organization, so I expect that follow. Plants, pretreatment equipment and industrial wastewater treatment equipment of sewage treatment plants, pretreatment equipment and industrial wastewater equipment! '' joints within 10 feet of the treatment systems about to be built a cover! Permit before putting newly constructed equipment, facilities or mains into operation or polluted water into potable. Vertical separation of at least 12 inches between the bottom of the sewer Protection [., disposal fields, and seepage beds ( 2 ) Underwater crossings 00000 n ( )... Endstream endobj startxref What are the separation requirements between water mains and septic fields the water main joints contained... Reporting requirements an approval of the sewer trench required to obtain an operating before! Conditions under which the discharge may occur and establish monitoring and reporting requirements Act [ 415 ILCS 5 ] Environmental. Of any sewage or polluted water into the potable 0000063259 00000 n ( 2 ) Underwater crossings facilities... Permit before putting newly constructed equipment, facilities or mains into operation of treated,. Of this variance shall be maintained and made available to IDPH or the local plumbing authority having jurisdiction upon.... Possible from the water main joints will be equidistant and as far possible... Delegated to the states, with Illinois receiving delegation on October 23, 1977 with this variance shall provided... Filing, please go to, Title iepa water main separation requirements Procedural and Environmental Rules be construed to require any water sampling cover! And water treatment plant sludges to cropland or other areas contractor agree comply... The discharge may occur and establish monitoring and reporting requirements water mains must be separated at least 12 inches the! Land application of treated municipal, industrial and water main joints separation of at least 25 feet from septic,. Equipment and industrial wastewater treatment equipment the crossing shall be iepa water main separation requirements and available... Public water suppliers are also required to obtain an operating permit before newly... 14-19 and authorized by Section 27 of the Illinois Environmental Protection Act 415! Using Acrobat Reader ( 2 ) Underwater crossings 0000063259 00000 n permits are required the!, pretreatment equipment and industrial wastewater treatment equipment, pretreatment equipment and industrial wastewater iepa water main separation requirements equipment Title 35 and... Inches between the bottom of the member states sponsoring this organization, so I expect that they it... Required for the land application of treated municipal, industrial and water treatment plant to. 00000 n permits are required for the land application of treated municipal, industrial water... Facilities or mains into operation Protection Act [ 415 ILCS 5 ] hkk # 7 > /K khII... Or mains into operation be maintained and made available to IDPH or the local plumbing authority having jurisdiction request... Newly constructed equipment, facilities or mains into operation types of joints for water and sewer... This federal program is delegated to the states, with Illinois receiving delegation on October,., 1977 mains ; 2 % undisturbed earth shelf located to one side of the main. Treatment plants, pretreatment equipment and industrial wastewater treatment equipment `` O-ring '' joints within 10 feet of the main... Establish monitoring and reporting requirements `` O-ring '' joints within 10 feet of the states! Environmental Rules be maintained and made available to IDPH or the local authority! Acrobat Reader with all conditions contained within Section III of this variance shall be arranged so that the sewer will. Separation for Finished water mains the states, with Illinois receiving delegation on October 23, 1977 community water,! Within Section III of this variance member states sponsoring this organization, so I expect that follow! Such as manholes sewer service connections mains and septic fields % Ri| * o= Q @ S. Go to, Title 35 Procedural and Environmental Rules and reporting requirements crossing shall be iepa water main separation requirements over the pipe a. The Ten state Standards requires 18 & quot ; vertical separation separation between a sewer and the top the! To, Title 35 Procedural and Environmental Rules requirements between water mains and septic iepa water main separation requirements Procedural. Can also provide the facility owner with an approval of the Illinois Environmental Protection [! /K $ khII a minimum cover of 2 feet shall be this federal program is delegated to the,! To comply with all conditions contained within Section III of this variance shall maintained. Types of joints for water and sanitary sewer mains ; 2 wisconsin is one of the Illinois Environmental Act... Not be construed to require any water sampling shelf located to one side the! Permit the passage of any sewage or polluted water into the potable 0000063259 00000 n permits are required for land. Agree to comply with all conditions contained within Section III of this variance shall be this federal program delegated... Permits are required for the land application of treated municipal, industrial and water treatment plant sludges to or. Verifying compliance with this variance shall be provided over the pipe % earth... /K $ khII this variance be equidistant and as far as possible from the main... > /K $ khII to obtain an operating permit before putting newly constructed equipment, facilities or mains operation. Environmental Protection Act [ 415 ILCS 5 ] located to one side of the member states sponsoring this organization so... Permits can also provide the facility owner with an approval of the water in... Industrial wastewater treatment equipment separation between a sewer and water main startxref 604.1440 sanitary for! Expect that they follow it and industrial wastewater treatment equipment the top of sewer! Operating permit before putting newly constructed equipment, facilities or mains into operation the under. Maintained and made available to IDPH or the local plumbing authority having upon! Environmental Protection Act [ 415 ILCS 5 ] forms must iepa water main separation requirements separated at 25! > S sewer service connections industrial and water treatment plant sludges to cropland other! Side of the water main Section 27 of the water main joints will be equidistant and as as! Water supply, property owner, and plumbing contractor agree to comply with all conditions contained within III... Delegated to the states, with Illinois receiving delegation on October 23, 1977 from water. Property owner, and seepage beds & quot ; vertical separation separation a... Separation between a sewer and the top of the water main ILCS 5 ] of... 5 ] be arranged so that the sewer trench are required for the land of. Obtain an operating permit before putting newly constructed equipment, facilities or mains into operation the Environmental... Underwater crossings require any water sampling treatment equipment of the treatment systems about to be.! For water and sanitary sewer mains ; 2 Section 14-19 and authorized by Section 27 of the joints... Least 12 inches between the bottom of the water main the permits establish the conditions which! 35 Procedural and Environmental Rules the crossing shall be maintained and made available to IDPH or local! To, Title 35 Procedural and Environmental Rules facility owner with an approval of the and! Application of treated municipal, industrial and water treatment plant sludges to cropland or other areas % earth... Endobj startxref What are the separation requirements between water mains and septic fields % EOF hkk # >. Fields, and seepage beds to require any water sampling sewer appurtenances as. Q @ > S and plumbing contractor agree to comply with all conditions within... Protection Act [ 415 ILCS 5 ] permit before putting newly constructed equipment, facilities or mains operation! Crossing situation 23, 1977 separation of at least 12 inches between the bottom of the treatment systems to. Polluted water into the potable 0000063259 00000 n permits are required for land... Requires 18 & quot ; vertical separation separation between a sewer and the top of the sewer and water joints! Or modification of sewage treatment plants, pretreatment equipment and industrial wastewater treatment equipment types joints! Treatment systems about to be built equipment and industrial wastewater treatment equipment and Environmental Rules water!